Belleville Wastewater Treatment Facility

Type

Business

Country

USA

Last Update: March 19, 2022

About us

The City's sewage treatment plants, located at 450 Environmental Drive, operate 24 hours per day and are permitted to treat 12.4 million gallons of wastewater each day with a maximum excess flow capacity of 24 million gallons per day.

Currently, the average daily flow through the treatment system is 5 to 6 million gallons per day. The plant is fed by nearly 300 miles of sewage collection lines. The entire collection system has 50 sewage lift stations that pump sewage from low-lying areas to the plant via sewer collection lines.

contact

location

450 Environmental Drive Belleville, IL 62220